Heyya all, I have a little dilemma. The plumber has installed both vanities (in main & ensuite bathrooms) and has not removed the hard plastic packaging at the bottom corners. I’m pretty sure they are glued in place already (actually more like sure) This means they sit up about 2mm from the floor tile and sit away about 2mm from the base of the wall tile and meet at the top.
Has anyone else had this problem and if so what did you do? I have a feeling they’ll want to just easy fix and break off what’s showing of the plastic and caulk where it’s exposed (I really don’t want this)
We’re on the home stretch of this huge reno and it got me this arv.. Am I overreacting?
The plumber has installed both vanities and has not removed the hard plastic packaging at the bottom corners
Re: The plumber has installed both vanities and has not removed the hard plastic packaging at the bottom corners
They need to be removed. That’s a rather big boo boo on the tradies part. I would request they were removed and have them installed again correctly.
Re: The plumber has installed both vanities and has not removed the hard plastic packaging at the bottom corners
Omg… yea nope.. uninstall and re-install. Check over with a fine tooth comb for damage afterwards too..
Last bumped by Anonymous on Tue Oct 11, 2022 8:52 am.
-
- Similar Topics
- Replies
- Views
- Last post
-
- 4 Replies
- 59 Views
-
Last post by Batman
Who is online
Users browsing this forum: No registered users and 0 guests